How it works

Address and option in.
Cited rules, a massing and a dated memo out.

The rules are held as data, with a source and a date on every line. A deterministic engine reads them. A person confirms twice. No language model is in the loop.

01Inside the tool

Five inputs. Six layers of rules. Six outputs.

Every rule in the stack is a structured clause with its source, its section and the date it took effect. From then on it is data, reused for every address and re-read only when a rule changes.

02The logic

The engine decides. A person confirms twice.

Twelve steps: eight are script, one reads text once, three are checks that stop on failure, two belong to a person. A rule marked unsure stops that rule and is reported as uncertain, never passed.

03The rule stack

Six layers apply to one address at the same time.

Each is written by a different body and changes on its own date. Where two layers conflict on geometry the stricter governs; where the Province sets a floor, it overrides a lower local maximum.

  1. A · 4 rulesZoning district

    The shape a building may take.

    Height, setbacks, floor space ratio, parking; a CD-1 site's limits are whatever the rezoning sets. Vancouver Zoning and Development By-law.

  2. B · 2 rulesProvince

    Floors a city cannot go below.

    Small-scale multi-unit minimums by lot size and bus stop; minimum heights near stations. Bills 44 and 47, in force since 2024.

  3. C · 5 rulesCity policy

    What attaches to a rezoning.

    Family units, social housing, below-market rents, the tree by-law, development charges. The family-unit rule changed on 27 Oct 2026.

  4. D · 2 rulesDesign standards

    What shapes the option itself.

    BC Housing's minimum unit areas; the code basis under the 2025 Vancouver Building By-law. Flags, not checks.

  5. E · 4 rulesFunders

    Not law, but whether money flows.

    Community Housing Fund, BC Builds, the predevelopment loan, CMHC readiness: published criteria, applied as written.

  6. F · 7 assumptionsAssumptions

    What the pro-forma counts with.

    A Class D hard cost, the Statistics Canada price index, the Bank of Canada rate, CMHC rents, CMHC's coverage ratio: dated, cited, refreshed by a command. Placeholders say so.

  7. By designLeft to a person

    Four things stay uncertain.

    Which transit-oriented tier a parcel falls in, what a CD-1 rezoning is negotiated to, whether a council waives the charges, and the land price on a private site.

04In the tool

Four steps on one page. The memo is on screen first.

The tool opens on a memo, not a form. The inputs sit beside it and fold away; the step strip is a sense of progress, not a locked wizard.

  1. 01Site

    Pick a site, or start one.

    Address, district, lot, trees, owner. Every yes/no fact is Yes / No / Not sure.

  2. 02Option

    Describe the building.

    Storeys, floor area, units, tenure, funders. The unit total and the family share update as you type.

  3. 03Run and read

    Three answers, the money, then the ledger.

    Under a second. Figures beside the answers; a fourth card on whether the money works; every rule with its numbers and its source; two runs side by side.

  4. 04Export

    The PDF for the board. The massing for Revit.

    A paper memo for a reviewer; a pyRevit script puts the masses on an annotated sheet and the sheet comes back as FIG 03.